So in the last 2 months we have done quite a bit of updating our kitchen here is the list and pictures
* putting on hardware for all lower cabinet doors and drawers
* adding floor board and trimming for the back of the peninsula
* Painting the lower cabinets
* demo the soffit
* remove upper cabinets
* build floor to ceiling wall tower
* build and install all upper cabinets
Whats left of phase 1
* finish customizing upper cabinets
* build install paint upper cabinet doors
* install crown molding and bottom of cabinet trim piece
* upper cabinet hardware
* wall cabinet installation
* hood ordered and installed
* sand and paint backsplash for now
* caulk, touch up, repair any needed spots
Phase 2
* trim in window
* replace window
* paint bottom of counter and add plywood piece
* move some electrical work
* cobbles on peninsula
* backsplash
and i'm sure there are things I can't think of right now
As of late I haven't been doing much creating.
11 years ago
No comments:
Post a Comment